Approach for Measuring Reductions in Delivery Time: Baseline Measures of Construction Industry Practices for the National Construction Goals.
Approach for Measuring Reductions in Delivery Time:
Baseline Measures of Construction Industry Practices for
the National Construction Goals.
(22172 K)
Chapman, R. E.; Rennison, R.
NISTIR 6189; 212 p. July 1998.
Sponsor:
National Science and Technology Council, Washington, DC
Available from:
National Technical Information Service
(NTIS), Technology Administration, U.S. Department of
Commerce, Springfield, VA 22161.
Telephone:
1-800-553-6847 or 703-605-6000;
Fax: 703-605-6900.
Website: http://www.ntis.gov
Order number: PB98-148299
Keywords:
building economics; building materials; building
maintenance; construction; costs; economic analysis;
energy costs; energy consumption; energy conservation;
maintenance costs; metrics; operations costs
Abstract:
The Construction and Building Subcommittee of the
National Science and Technology Council is developing
baseline measures of current construction industry
practices and measures of progress with respect to each
of the seven National Construction Goals. The seven
National Construction Goals are concerned with: (1)
reductions in the delivery time of constructed
facilities; (2) reductions in operations, maintenance,
and energy costs; (3) increases in occupant productivity
and comfort; (4) reductions in occupant-related
illnesses and injuries; (5) reductions in waste and
pollution; (6) increases in the durability and
flexibility of constructed facilities; and (7)
reductions in construction worker illnesses and
injuries. Baseline measures and measures of progress
are being produced for each of the four key construction
industry sectors. The four sectors are: (1)
residential; (2) commercial/institutional; (3)
industrial; and (4) public works. This document
provides a detailed set of baseline measures for
National Construction Goal 1 (reductions in delivery
time). As such, it describes data sources, data
classifications and hierarchies, and the metrics used to
develop the baseline measures. Extensive use of charts
and tables is made throughout this document to
illustrate the process by which the baseline measures
were developed.