Simulation-Facilitated Factor-Based Approach for Cost Correlation Evaluation.
Simulation-Facilitated Factor-Based Approach for Cost
Correlation Evaluation.
(171 K)
Wang, W. C.
NIST SP 989; September 2002.
International Symposium on Automation and Robotics in
Construction, 19th (ISARC). Proceedings. National
Institute of Standards and Technology, Gaithersburg,
Maryland. September 23-25, 2002, 97-102 pp, 2002.
Available from:
Superintendent of Documents, U.S.
Government Printing Office, Mail Stop SSOP, Washington,
DC 20402-0001.
Telephone: 202-512-1800.
Fax:
202-512-2250.
Website: http://www.bookstore.gpo.gov
Order number: PB2002-108230
Keywords:
robotics; construction; costs; computer simulation;
risks; uncertainty; evaluation
Building and Fire Research Laboratory
National Institute of Standards and Technology
Gaithersburg, MD 20899